Analysis of a Concrete Diaphragm Wall

Software

Version Notes:
FLAC 8.0

Level: Intermediate
Runs in Demo: Yes

Write Up
Walk Through
Project Files
Consulting Services

The stages of construction of a concrete diaphragm wall are simulated with FLAC. The analysis begins with the concrete diaphragm wall cast in place. Dewatering, excavation and installation of support struts are simulated in five excavation stages. Distribution of shear forces and bending moments in the wall, axial forces in the struts and displacements of the soil behind the wall are calculated during the five stages.

Keywords

  • Multistage excavation
  • Dewatering
  • Concrete diaphragm wall
  • Support struts
  • Importing stratigraphy geometry
  • Beam elements
  • Interfaces
  • Large strain
  • Mohr-Coulomb model

Materials

  • Concrete
  • Soil

Analyses

  • Fluid Flow
  • Static
Latest News
  • ITASCA Strengthens North American Delivery of Integrated Geomechanics and Hydrogeology Solutions Drawing on decades of geomechanical and hydrogeological expertise, ITASCA has announced the formation of ITASCA...
    Read More
  • WEBINAR: Solving Geothermal Challenges with XSite Numerical Modeling ITASCA Software and Baker Hughes are hosting a collaborative webinar to demonstrate how combining advanced...
    Read More
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
    Read More