Example of Shimizu Tunnel No 3 in UDEC 7.00

Logiciels

Version Notes:
UDEC 7.00

Level: Intermediate
Runs in Demo: No

Write Up
Walk Through
Project Files
Domaines d'activité
This example demonstrates the use of UDEC to model a tunnel excavation in a jointed rock mass.

This example demonstrates the use of UDEC to model a tunnel excavation in jointed rock mass. In this demonstration, geometry sets are used to create the tunnel geometry. The Barton Bandis model is used to represent the joints. The "block solve relax" command is used to simulate the pre-relaxation of the rock mass while excavating the tunnel.

Keywords

  • Geometry sets
  • Barton-Bandis
  • Ground reaction curve
  • Shotcrete
  • Bolt
Dernières Nouvelles
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
    En savoir plus
  • 6th Itasca Symposium on Applied Numerical Modeling The next Itasca Symposium will take place June 3 - 6, 2024, in Toronto, Canada....
    En savoir plus
  • Itasca International Inc. announces the Selection of its New CEO Itasca International Inc. announces the nomination of its new CEO ...
    En savoir plus

Évènements à Venir
29 mai
Getting Started with FLAC2D/FLAC3D
Objectifs de la formation: - Comprendre l'approche numérique de FLAC2D/ FLAC3D et les types deproblèmes qu'elle permet de résoudre- Sav... En savoir plus
5 juin
IMAT Workshop
ITASCA is launching IMAT (Itasca's Mining Analysis Toolbox) our groundbreaking software tailored exclusively for underground and open p... En savoir plus