Lined Tunnel Construction in Saturated Ground

Logiciels

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Domaines d'activité

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Dernières Nouvelles
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
    En savoir plus
  • 6th Itasca Symposium on Applied Numerical Modeling The next Itasca Symposium will take place June 3 - 6, 2024, in Toronto, Canada....
    En savoir plus
  • Itasca International Inc. announces the Selection of its New CEO Itasca International Inc. announces the nomination of its new CEO ...
    En savoir plus

Évènements à Venir
29 mai
Getting Started with FLAC2D/FLAC3D
Objectifs de la formation: - Comprendre l'approche numérique de FLAC2D/ FLAC3D et les types deproblèmes qu'elle permet de résoudre- Sav... En savoir plus
5 juin
IMAT Workshop
ITASCA is launching IMAT (Itasca's Mining Analysis Toolbox) our groundbreaking software tailored exclusively for underground and open p... En savoir plus