Lined Tunnel Construction in Saturated Ground

Logiciels

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Domaines d'activité

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Dernières Nouvelles
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
    En savoir plus
  • 6th Itasca Symposium on Applied Numerical Modeling The next Itasca Symposium will take place June 3 - 6, 2024, in Toronto, Canada....
    En savoir plus
  • Itasca International Inc. announces the Selection of its New CEO Itasca International Inc. announces the nomination of its new CEO ...
    En savoir plus

Évènements à Venir
25 févr.
Débuter avec FLAC2D/FLAC3D
Cette formation est une introduction à la modélisation continue avec FLAC2D et FLAC3D. A la fin du cours, les participants maîtriseront... En savoir plus
11 mars
Débuter avec 3DEC
Objectifs de la formation :- Comprendre l'approche numérique 3DEC et les types de problèmes qu'elle peut résoudre- Manipuler l'interfac... En savoir plus
26 mars
Python in Itasca Software
Cette formation vous donnera toutes les clés pour être capable d’utiliser Python afin d'étendre les capacités de simulation des logicie... En savoir plus